1. Install access track from Beach Valve Station to offshore-onshore tie-in
point and clear working area for access to both sides of GEP and spoil
storage;
2. Remove rock cap covering and intimate backfill from tie-in point and
upstream of GEP;
3. Perform coating inspection and repair defects, if identified;
4. Install corrosion probes at the 12 ‘o’ clock position on the GEP near the tiein
point and install new Cathodic Protection test post to monitor CP
performance at this location;
5. Back fill with sand along the exposed GEP sections;
6. Replace filter membrane / geotextile to prevent particle migration;
7. Replace rock cap covering;
8. Reinstate working area and access track.