top of page

BEACH VALVE Inspection Project.

1. Install access track from Beach Valve Station to offshore-onshore tie-in

point and clear working area for access to both sides of GEP and spoil

storage;

2. Remove rock cap covering and intimate backfill from tie-in point and

upstream of GEP;

3. Perform coating inspection and repair defects, if identified;

4. Install corrosion probes at the 12 ‘o’ clock position on the GEP near the tiein

point and install new Cathodic Protection test post to monitor CP

performance at this location;

5. Back fill with sand along the exposed GEP sections;

6. Replace filter membrane / geotextile to prevent particle migration;

7. Replace rock cap covering;

8. Reinstate working area and access track.







bottom of page